Company approved facility/operation area as of 2026.
Support your production decision with clear information.
We collect the basic answers your purchasing team needs about product suitability, order quantity, target date, quality approach and approval responsibilities in one place.
Order-specific conditions are clarified in writing after review.

Product specific evaluation
Clear approval responsibilities
Verified information approach

Sedex Member
We support our responsible sourcing approach with shareable information.
We manage our ethical, social and environmental supply chain information through the Sedex platform and share it with our authorized customers.Sedex membership is not a certification; It is a membership structure that supports the management and sharing of information regarding responsible business practices.Company approved evidence
Verified sources for your purchase file.
Normal planning value; Exact capacity is confirmed based on product mix and order conditions.
It is the number of cut pieces; It is not the finished shirt MOQ.
Special packaging scope is planned on an order-specific basis.
Product complexity depends on the completion of material and technical inputs.
Revision and material supply conditions may affect the duration.
Order scope is planned after approvals and material preparation are completed.
The exact threshold is determined at the bidding stage according to model, colour, fabric, accessories and production plan.

Facility exterior view
Company-approved current view of the Erten Tekstil production facility in Başakşehir, Istanbul.
Registration date: 2026-07-28
shirt sewing line
Company-approved current working view of the shirt production line.
Registration date: 2026-07-28
Finished product flow
Company-approved current view of the finished shirt flow before control and preparation for shipment.
Registration date: 2026-07-28
Folding and packaging
Company-approved current view of folding and packaging preparation.
Registration date: 2026-07-28Sharing level controlled documents
The identity, scope and currency of these records have been confirmed by the company; The file link is not public.
AQL 2.5 and ITS quality control record
ITS procedure and reporting scope with in-line and final audit approach has been verified by the company; It is shared upon request according to the scope of the order.
- Edited by
- Erten Tekstil
- Scope
- AQL 2.5 inline/final audit approach and ITS procedures/reports
- Validity
- It is not timed; recheck date recorded
Sedex membership and SMETA audit registration
Sedex membership and SMETA audit records have been verified by the company. Sedex membership is not offered as a product certificate.
- Edited by
- Sedex / authorized inspection organization
- Scope
- Company membership and social compliance audit records
- Validity
- It is not timed; recheck date recorded


Slim fit, regular fit, classic, casual, linen, denim and special occasion shirts
Erten Shirts: own brand showcase from production to market
- Need
- To bring different fabrics, patterns and usage scenarios to the market with consistent product standards and brand presentation.
- Solution
- Product development, shirt production, quality control and direct B2C collection presentation are carried out in the same company ecosystem.
- Conclusion
- Product collections and international shipping areas are visible in the active Erten Shirts store dated 2026.
Shipment preparation according to customer instructions
Products that pass the final control are taken to the shipping warehouse and prepared for shipment according to customer instructions.
Party responsibilities are mapped to the company-approved record.Erten Shirts international market access
Erten Shirts B2C channel supports international shipping including Germany, USA, UK, France, Italy, Canada and Russia. This record is not a B2B export volume or Incoterms commitment.
Party responsibilities are mapped to the company-approved record.Erten Tekstil B2B Team
Verified corporate contact channel for production, sample, capacity, quality certificate and facility meeting requests.
Erten Tekstil B2B Capability File 2026
Company approved production scope, capacity framework, quality approach, delivery model and corporate contact information.
Purchasing checklist
Direct answers to five basic questions.
Can we produce your product?
We examine your product file or reference sample and clarify production suitability in writing.
- Initial information you need
- Product image, sample or product and measurement file
- The first printout you will receive is
- Manufacturability result and information to be clarified
Are your period and target date appropriate?
We evaluate the quantity, model distribution, material status and approval dates together.
- Initial information you need
- Approximate quantity, model-color-size distribution and delivery point
- The first printout you will receive is
- Applicable order structure and date assumptions
How do we ensure quality?
We protect the approved sample with measurement, workmanship, appearance and packaging controls throughout production.
- Initial information you need
- Approved sample, dimensions and important workmanship expectations
- The first printout you will receive is
- Order-specific control and approval points
At what stages do you need your approval?
We make product demand, material, sample, pre-production preparation, packaging and shipping decisions visible.
- Initial information you need
- Decision makers and feedback method
- The first printout you will receive is
- Clear flow of who, what and when to approve
What happens after your request?
We check your information, clarify any deficiencies and share with you the appropriate next step.
- Initial information you need
- Email, product line, approximate quantity and target date
- The first printout you will receive is
- List of missing information and appropriate next step
What supports trust?
Instead of a claim, information with clear source and scope.
Not every document or record may be publicly available. In content that can be shared, we rely on verifying the source, validity, which facility or process it covers, and sharing permission.Content that is unverified, expired, or does not have permission to share will not be provided as proof of sale.
Product and sample references
Approved sample, measurement information and registered product decisions.
Production control scope
Pre-production, production sequence and final product controls according to product structure.
Plant and process visibility
Erten real visuals from the production area and a scheduleable site visit.
Document requests
Only documents whose currency, scope and sharing authority have been verified.

See the production on site
Let's plan the facility visit with your product scope.
Visit requests are evaluated in advance, taking into account operational suitability, production security and confidentiality conditions.Request a facility visit Explore the factorybefore you decide
What the purchasing team needs to know.
01Can we produce your product?
We examine the pattern, fabric, accessories, workmanship and target quality level together to clarify production suitability. We will notify you in writing of the applicable scope, the information that needs to be clarified and the necessary changes.
02Are your period and target date appropriate?
Minimum production quantity and delivery time are determined according to the structure of each order. Model, color and size distribution; We create a feasible plan by evaluating material supply and sample approval schedule together.
03How do we ensure quality?
We manage quality not just as a result control, but as a recorded process from approved sample to shipment. We only provide shareable documents and production records after their currency and permission to share have been verified.
04At what stages do you need your approval?
We rely on your approval for decisions affecting the appearance, size, cost or delivery date of the product. At each stage, we clearly state what you are approving and what next step that approval initiates.
05What happens after your request?
When your request arrives, we review the product, quantity and target date information together. After clarifying the missing points, we write down the next steps of the sample, proposal and production plan for the appropriate scope.
first review
